Construction Site Runoff Control

The Storm Water Management Ordinance requires an approved Storm Water Pollution Prevention Plan (SWPPP) for land disturbance over 1 acre or a land disturbance of less than 1 acre provided that it is part of a larger plan of development. This plan must be submitted as part of the construction plans.

For construction sites smaller than 1 acre please contact the Building Department at 219-926-2610.

Post-Construction


The Town requires that long-term storm water control operation and maintenance plans to be submitted and approved as part of the post-construction approval process (formerly known as post-construction narratives).

The Storm Water O&M Plan is required to be approved before completion of the project. The plan describes the long-term maintenance guidelines for all post-construction storm water quality measures installed as part of the project to facilitate their proper long-term function.  A copy of the plan should be provided to the owner/manager of the property, and to the Town.  The Town's requirements for Post-Construction Storm Water Management, including Performance Criteria and Monitoring and Inspection, can be found in Town Code, Chapter 24, Article V, Sections 24-101 through 24-106.  

Get a Permit


All construction sites over 1 acre must have an approved Erosion and Sediment Control (ESC) Permit and Storm Water Pollution Prevention Plan prior to any land disturbance activity. Read the Project Owner Compliance Guide below to see what steps you should take to successfully receive approval for your project.
Important Note
Project Owners are required to purchase the Storm Water Best Management Practices Technical Manual available for $5 at the Municipal Complex: